It is a content.

Announcement of the operation mode switch for the PTV signal (L5S) on QZS-1R

Aug.20,2025
National Space Policy Secretariat, Cabinet Office

Regarding the switching of the L5S signal operation mode transmitted by QZS-1R, as announced on July 1, 2025, the work has been carried out from 9:00 JST on July 28 to 17:00 JST on August 19, 2025, and the L5S signal operation mode transmitted by QZS-1R has been switched from the standard mode to the verification mode as scheduled.